Operation
4
Attachments
6210_003-035
10
11
14
12
15
17
13
16
– Note the following attachment functions and
pictograms.
10
Move side shift frame or fork for-
wards/backwards
11
Move sideshift to the left/right
12
Adjust fork arms: open/close
13
Swivel lift mast or fork to the left/right
14
Release/clamp load retainer
15
Push off/pull in load
16
Turn to the left/right
17
Tip shovel over/tip shovel back
.
Clamp locking mechanism (variant)
This truck can be fitted with a clamp locking
mechanism as a variant. This clamp locking
mechanism prevents the clamp from opening
unintentionally if the operating function is
inadvertently triggered.
DANGER
There is a risk of fatal injury from falling loads if the
correct function of the clamp locking mechanism is
not guaranteed!
If other attachments are used on this truck in addi-
tion to the clamp, make sure that the clamp locking
mechanism function is reassigned to the corre-
sponding operating device every time the clamp is
reassembled; see the chapter entitled "Fitting at-
tachments".
– Make sure that the additional clamp locking
mechanism function is available.
56338011803 EN - 02/2019 - 09
231
www.
duma
-rent.com
Содержание RX60-25
Страница 2: ...www duma rent com ...
Страница 4: ...www duma rent com ...
Страница 14: ...www duma rent com ...
Страница 15: ...1 Foreword www duma rent com ...
Страница 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Страница 39: ...2 Safety www duma rent com ...
Страница 71: ...3 Overviews www duma rent com ...
Страница 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Страница 86: ...3 Overviews Operating devices and display elements 72 56338011803 EN 02 2019 09 www duma rent com ...
Страница 87: ...4 Operation www duma rent com ...
Страница 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Страница 385: ...5 Maintenance www duma rent com ...
Страница 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Страница 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Страница 424: ...5 Maintenance Preserving operational readiness 410 56338011803 EN 02 2019 09 www duma rent com ...
Страница 432: ...5 Maintenance 1000 hour maintenance yearly maintenance 418 56338011803 EN 02 2019 09 www duma rent com ...
Страница 433: ...6 Technical data www duma rent com ...
Страница 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Страница 469: ...www duma rent com ...
Страница 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...