![Still RX60-25 Скачать руководство пользователя страница 110](http://html.mh-extra.com/html/still/rx60-25/rx60-25_original-instructions-manual_1379971110.webp)
4
Operation
Checks and tasks before daily use
NOTE
Accurate zero adjustment is only possible
within the first lifting stage of the lift mast.
When carrying out the zero adjustment, do not
raise the fork more than 800 mm above the
ground.
NOTE
The way in which the lifting system is operated
depends on the operating devices included in
the truck's equipment; see the chapter entitled
"Lifting system operating devices".
– Set lift mast to vertical.
– Raise the fork to a height of 300-800 mm.
6210_003-071_V2
2
1
– Press the Softkey
(1).
The zero adjustment of the load measurement
is switched on. The symbol
is displayed.
The message
LOWER FORKS
appears on the
display.
NOTE
During the following process, the fork carriage
must be lowered slightly and then stopped
abruptly. While doing so, the fork must
not touch the ground, otherwise the zero
adjustment will not be accurate. To stop
the lowering procedure quickly, release the
operating device for lowering so that it jumps
into the zero position.
– Lower the fork carriage slightly and release
the operating device.
When the zero adjustment has been carried
out correctly, the value "0 kg" appears on the
display.
– The zero adjustment of the load measure-
ment is completed. The symbol
(2) is
displayed.
96
56338011803 EN - 02/2019 - 09
www.
duma
-rent.com
Содержание RX60-25
Страница 2: ...www duma rent com ...
Страница 4: ...www duma rent com ...
Страница 14: ...www duma rent com ...
Страница 15: ...1 Foreword www duma rent com ...
Страница 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Страница 39: ...2 Safety www duma rent com ...
Страница 71: ...3 Overviews www duma rent com ...
Страница 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Страница 86: ...3 Overviews Operating devices and display elements 72 56338011803 EN 02 2019 09 www duma rent com ...
Страница 87: ...4 Operation www duma rent com ...
Страница 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Страница 385: ...5 Maintenance www duma rent com ...
Страница 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Страница 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Страница 424: ...5 Maintenance Preserving operational readiness 410 56338011803 EN 02 2019 09 www duma rent com ...
Страница 432: ...5 Maintenance 1000 hour maintenance yearly maintenance 418 56338011803 EN 02 2019 09 www duma rent com ...
Страница 433: ...6 Technical data www duma rent com ...
Страница 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Страница 469: ...www duma rent com ...
Страница 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...