Operation
4
Attachments
6210_003-080
F1
F1
F2
F2
1
2
Fingertip switch
– To release the clamp locking mechanism,
push the operating lever (1) forwards.
The LED for button "F2" (2) lights up as long
as the clamp locking mechanism is released.
NOTE
The hydraulic function for opening the clamp
is available for one second after the clamp
locking mechanism is released. After one
second, the clamp locking mechanism is
automatically reactivated.
– To open the clamp, push the operating lever
(1) forwards again.
It is not necessary to release the clamp locking
mechanism in order to close the clamp.
– To close the clamp, pull the operating lever
(1) backwards.
1
2
3
7090_860-002
Taking up a load using attachments
WARNING
Risk of accidents!
Attachments may only be used for their intended
purpose as described in the relevant operating
instructions.
Drivers must be instructed in the handling of the
attachments.
WARNING
Risk of accidents!
Loads may only be picked up and transported with
attachments if they are securely attached. Where
necessary, loads should also be secured against
slipping, rolling, falling over, swinging or tipping
over. Note that any change to the position of the
load's centre of gravity will affect the stability of the
forklift truck.
Check the capacity rating plates for the attachments
or combination of attachments.
– The rating plates show the permissible
values for:
56338011803 EN - 02/2019 - 09
235
www.
duma
-rent.com
Содержание RX60-25
Страница 2: ...www duma rent com ...
Страница 4: ...www duma rent com ...
Страница 14: ...www duma rent com ...
Страница 15: ...1 Foreword www duma rent com ...
Страница 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Страница 39: ...2 Safety www duma rent com ...
Страница 71: ...3 Overviews www duma rent com ...
Страница 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Страница 86: ...3 Overviews Operating devices and display elements 72 56338011803 EN 02 2019 09 www duma rent com ...
Страница 87: ...4 Operation www duma rent com ...
Страница 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Страница 385: ...5 Maintenance www duma rent com ...
Страница 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Страница 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Страница 424: ...5 Maintenance Preserving operational readiness 410 56338011803 EN 02 2019 09 www duma rent com ...
Страница 432: ...5 Maintenance 1000 hour maintenance yearly maintenance 418 56338011803 EN 02 2019 09 www duma rent com ...
Страница 433: ...6 Technical data www duma rent com ...
Страница 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Страница 469: ...www duma rent com ...
Страница 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...