5
Maintenance
Preserving operational readiness
CAUTION
Risk of component damage!
If you remove the battery male connector when the
key switch is switched on (under load), an arc will be
produced. This can lead to erosion at the contacts,
which considerably shortens their service life.
– Switch off the key switch before the battery male
connector is disconnected.
– Do not disconnect the battery male connector
while the key switch is switched on, except in an
emergency.
DANGER
Risk of fire!
Using the wrong fuses can result in
short circuits.
– Only use fuses with the prescribed
nominal current.
NOTE
Depending on the equipment, not all fuses will
be present in the truck.
1
Fuses for standard equipment and equipment
variants are located in the rear part of the
control electronics (1).
– Open the cover.
– Remove the cover from the control electron-
ics.
– Replace the blown fuse; see the section
entitled "Fuse assignment".
CAUTION
Water in the electrical system can
cause damage to components!
In order to protect the electrical system
against ingress of water, the cover
must be closed.
– Refit the cover after these tasks
have been completed.
– Connect the battery male connector.
– Carry out a functional test.
402
56338011803 EN - 02/2019 - 09
www.
duma
-rent.com
Содержание RX60-25
Страница 2: ...www duma rent com ...
Страница 4: ...www duma rent com ...
Страница 14: ...www duma rent com ...
Страница 15: ...1 Foreword www duma rent com ...
Страница 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Страница 39: ...2 Safety www duma rent com ...
Страница 71: ...3 Overviews www duma rent com ...
Страница 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Страница 86: ...3 Overviews Operating devices and display elements 72 56338011803 EN 02 2019 09 www duma rent com ...
Страница 87: ...4 Operation www duma rent com ...
Страница 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Страница 385: ...5 Maintenance www duma rent com ...
Страница 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Страница 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Страница 424: ...5 Maintenance Preserving operational readiness 410 56338011803 EN 02 2019 09 www duma rent com ...
Страница 432: ...5 Maintenance 1000 hour maintenance yearly maintenance 418 56338011803 EN 02 2019 09 www duma rent com ...
Страница 433: ...6 Technical data www duma rent com ...
Страница 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Страница 469: ...www duma rent com ...
Страница 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...