4
Operation
Handling loads
The load measurement has an accuracy of
+/-3% of the rated capacity of the truck.
NOTE
In order to ensure accuracy at all times, a zero
adjustment of the load measurement must be
carried out. Zero adjustment is required.
•
as part of daily commissioning
•
after changing the fork arms
•
after fitting or changing attachments.
Performing the load measurement
DANGER
Risk of accident from a falling load!
The load may fall if the load centre of gravity has not
been taken into account or the load has not been
picked up securely.
– Pick up the load securely; see the chapter
entitled "Picking up loads".
CAUTION
If the weight determined by a load measurement
exceeds the permissible residual load capacity of
the truck, the truck cannot be operated safely.
– Set down and reduce load immediately.
– If necessary, use another truck with sufficient
load-bearing capacity.
NOTE
Accurate load measurement is only possible
under the following conditions:
•
The hydraulic oil is at normal operating
temperature
•
The load is at rest at the beginning of the
load measurement
•
The load corresponds to at least 10% of the
nominal load capacity in trucks with a load
capacity of up to 2.5 t
•
The load corresponds to at least 5% of the
nominal load capacity in trucks with a load
capacity of 3 t and over
•
The lift mast is in the vertical position
•
The fork is not raised to more than 800 mm
above the ground
186
56338011803 EN - 02/2019 - 09
www.
duma
-rent.com
Содержание RX60-25
Страница 2: ...www duma rent com ...
Страница 4: ...www duma rent com ...
Страница 14: ...www duma rent com ...
Страница 15: ...1 Foreword www duma rent com ...
Страница 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Страница 39: ...2 Safety www duma rent com ...
Страница 71: ...3 Overviews www duma rent com ...
Страница 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Страница 86: ...3 Overviews Operating devices and display elements 72 56338011803 EN 02 2019 09 www duma rent com ...
Страница 87: ...4 Operation www duma rent com ...
Страница 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Страница 385: ...5 Maintenance www duma rent com ...
Страница 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Страница 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Страница 424: ...5 Maintenance Preserving operational readiness 410 56338011803 EN 02 2019 09 www duma rent com ...
Страница 432: ...5 Maintenance 1000 hour maintenance yearly maintenance 418 56338011803 EN 02 2019 09 www duma rent com ...
Страница 433: ...6 Technical data www duma rent com ...
Страница 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Страница 469: ...www duma rent com ...
Страница 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...