4
Operation
Replacing and transporting the battery
The authorised service centre also adapts the
truck electrics so that they will work with the
lithium-ion batteries.
This includes:
• The cable harness
• The battery male connector and the plug
connection
• Adjusting the display-operating unit
1
2
3
The changeover kit is supplied on a separate
pallet. It consists of truck-specific parts that
are approved by STILL.
1
Ballast weight
2
Spacer plate between the ballast weight
and the counterweight
3
Wooden chock for securing the battery
tray
After the conversion, the authorised service
centre identifies the truck with an additional
nameplate.
WARNING
Risk to stability!
If this changeover kit is not fitted, it will not be
possible to lock the lithium-ion battery into place,
which will result in unintended movement in the
battery compartment.
– The conversion must be performed only by the
authorised service centre.
– Only use lithium-ion batteries that have
been approved by STILL for use with this
truck.
NOTE
The use of lead-acid batteries is only possible
after the conversion to lithium-ion batteries if
the truck is converted back again.
334
56338011803 EN - 02/2019 - 09
www.
duma
-rent.com
Содержание RX60-25
Страница 2: ...www duma rent com ...
Страница 4: ...www duma rent com ...
Страница 14: ...www duma rent com ...
Страница 15: ...1 Foreword www duma rent com ...
Страница 38: ...1 Foreword Environmental considerations 24 56338011803 EN 02 2019 09 www duma rent com ...
Страница 39: ...2 Safety www duma rent com ...
Страница 71: ...3 Overviews www duma rent com ...
Страница 73: ...Overviews 3 General view 56338011803 EN 02 2019 09 59 www duma rent com ...
Страница 86: ...3 Overviews Operating devices and display elements 72 56338011803 EN 02 2019 09 www duma rent com ...
Страница 87: ...4 Operation www duma rent com ...
Страница 384: ...4 Operation Decommissioning 370 56338011803 EN 02 2019 09 www duma rent com ...
Страница 385: ...5 Maintenance www duma rent com ...
Страница 392: ...5 Maintenance General maintenance information 378 56338011803 EN 02 2019 09 www duma rent com ...
Страница 396: ...5 Maintenance General maintenance information 382 56338011803 EN 02 2019 09 www duma rent com ...
Страница 424: ...5 Maintenance Preserving operational readiness 410 56338011803 EN 02 2019 09 www duma rent com ...
Страница 432: ...5 Maintenance 1000 hour maintenance yearly maintenance 418 56338011803 EN 02 2019 09 www duma rent com ...
Страница 433: ...6 Technical data www duma rent com ...
Страница 458: ...6 Technical data Fuse assignment 444 56338011803 EN 02 2019 09 www duma rent com ...
Страница 469: ...www duma rent com ...
Страница 470: ...STILL GmbH 56338011803 EN 02 2019 09 www duma rent com ...