Chapter 7: Using the Command Line Interface
255
Setting the Outlet Power-On Sequence
This section only applies to outlet-switching capable PDUs.
This command syntax sets the outlet power-on sequence when the PDU
powers up.
config:#
pdu outletSequence <option>
Variables:
<option> is one of the options:
default
, or a comma-separated list of
outlet numbers.
Option
Description
default
All outlets are switched ON in the ASCENDING
order (from outlet 1 to the final outlet) when the
Dominion PX device powers up.
A comma-
separated list of
outlet numbers
All outlets are switched ON in the order you specify
using the comma-separated list.
The list must include all outlets on the PDU.
Example
The following command causes a 10-outlet PDU to first power on the 8th
to 6th outlets and then the rest of outlets in the ascending order after the
PDU powers up.
config:#
pdu outletSequence 8-6,1-5,9,10
Setting the Outlet Power-On Sequence Delay
This section only applies to outlet-switching capable PDUs.
This command syntax sets the delays (in seconds) for outlets when
turning on all outlets in sequence.
Содержание PX-1000 Series
Страница 423: ...Appendix E Integration 408 3 Click OK ...