Page
Page 2-2
2-2
LASAIR
LASAIR II
II Operator’s
Operator’s Manual
Manual
Chapter 2: Unpacking and Installation
Chapter 2: Unpacking and Installation
If all of the materials are included and undamaged, store the
If all of the materials are included and undamaged, store the packing materials.
packing materials.
It is important to store these materials because warranties may not apply if
It is important to store these materials because warranties may not apply if
return shipping containers are inadequate.
return shipping containers are inadequate.
Installing the LASAIR II
Installing the LASAIR II
Use the following installation sections as they apply to your use of the LASAIR
Use the following installation sections as they apply to your use of the LASAIR
II.
II.
Connecting Y
Connecting Your Power
our Power Source
Source
The power input is a
The power input is a standard EIA fused power
standard EIA fused power input of 100–240 V
input of 100–240 VAC, 50–60
AC, 50–60
Hz. A power cord is supplied with you
Hz. A power cord is supplied with your LASAIR II. The power cord for
r LASAIR II. The power cord for
European shipments may require the attachment of the
European shipments may require the attachment of the appropriate wall plug,
appropriate wall plug,
according to the electrical requirements.
according to the electrical requirements.
Ensure the main supply is properly
Ensure the main supply is properly
grounded!
grounded!
To connect power for the LASAIR II:
To connect power for the LASAIR II:
1
1
Plug the female end of the
Plug the female end of the cord into the power inlet. The inlet is loca
cord into the power inlet. The inlet is located on the
ted on the
left side of the back panel.
left side of the back panel.
2
2
Plug the 3-prong end of the cord into your power source.
Plug the 3-prong end of the cord into your power source.
NOTE:
NOTE:
The main power disconnect
The main power disconnect is the power cord. Ensure that
is the power cord. Ensure that it is easily
it is easily
accessible!
accessible!
Installing the Battery Pack
Installing the Battery Pack
Y
Your LASAIR II can be po
our LASAIR II can be powered solely by an optional rechargeable ba
wered solely by an optional rechargeable battery
ttery
pack. The battery pack can be
pack. The battery pack can be charged while it
charged while it is installed i
is installed in the LASAIR II
n the LASAIR II or
or
outside the LASAIR II
outside the LASAIR II with its optional BC II
with its optional BC II battery charger.
battery charger.
To install the battery pack:
To install the battery pack:
1
1
Remove the battery from its packaging.
Remove the battery from its packaging.
2
2
Position the battery pack with the label up and write the date you are placing the
Position the battery pack with the label up and write the date you are placing the
battery into service into the space provided on the label.
battery into service into the space provided on the label.
3
3
Open the battery chamber door on the back of the LASAIR II
Open the battery chamber door on the back of the LASAIR II
CAUTION
CAUTION
Particle Measuring Systems recommends the use of a good
Particle Measuring Systems recommends the use of a good quality surge
quality surge
protector to isolate the LASAIR II from volt
protector to isolate the LASAIR II from voltage spikes. Surge protectors are
age spikes. Surge protectors are
inexpensive and easily obtainable from many
inexpensive and easily obtainable from many office supply or computer
office supply or computer
equipment sources.
equipment sources.