51
3-2-2 Termination procedure
1.
Turn OFF the laser pumping.
• PC configuration software control: Click “Laser pumping ON/OFF” of the
“Laser Marker Operation” tool.
• Remote control: Turn off the laser pumping by LASER SUPPLY IN (X6) of I/
O terminal or by the laser pumping command (LSR).
2.
Overwrite the data as needed.
Click “Save” or “Save as” in the file menu.
If turning off the power of the laser marker without saving the file under dealing,
the data being edited is deleted. Be sure to check the file saving before turning
off the power.
For details on the operation method, please refer to the Laser Marker NAVI
smart Operation Manual.
3.
Disconnect the online connection.
Refer to “3-3-4 How to disconnect online connection” (P.58).
ワㄐㄕㄊㄆ
• Do not turn the laser marker power OFF while being connected to online. When the power gets turned OFF during data
communication, it may cause the data to corrupt or system failure.
4.
Exit from the Laser Marker NAVI smart.
Click “Exit” in the file menu.
5.
Turn OFF the key switch of the controller and remove the system key.
Please have the safety manager store the system key properly.
ヱヰヸユ
ン
ON
OFF
ME-LPGS-SM-8
Содержание LP-GS Series
Страница 17: ...1 Product Overview ME LPGS SM 8 ...
Страница 32: ...2 Laser Marker Installation ME LPGS SM 8 ...
Страница 48: ...3 Operation Method ME LPGS SM 8 ...
Страница 68: ...4 External Control Using I O ME LPGS SM 8 ...
Страница 107: ...5 External Control by Communication Commands ME LPGS SM 8 ...
Страница 116: ...6 Link Control with External Devices ME LPGS SM 8 ...
Страница 141: ...7 Maintenance ME LPGS SM 8 ...
Страница 161: ...161 MEMO ME LPGS SM 8 ...
Страница 162: ...Troubleshooting ME LPGS SM 8 ...
Страница 186: ...Index ME LPGS SM 8 ...
Страница 188: ...188 Unit power cable 26 USB 30 45 V Vibration resistance 33 W Warning 177 Z Z axis adjustment module 154 ME LPGS SM 8 ...
Страница 189: ......
Страница 190: ... Panasonic Industrial Devices SUNX Co Ltd 2014 2019 April 2019 ...