
TROUBLESHOOTING
Page 103
Core Inspection
GUIDELINES
With the exception of straightening minor bends
in the cold fins, the CMCAC core is not repairable
and should be replaced when more extensive
damage is encountered. To ensure that the
CMCAC system will function properly after repair
or replacement, a pressure/leak test is
recommended.
INSPECTION
1. Carefully inspect the entire system to
determine the exact location and extent of
damage.
2. Inspect the cold fins and cold bars that run
horizontally in the cooler.
3. Inspect all brazed or welded joints in the
header tank.
CMCAC Preventive Maintenance
In case of engine and/or turbocharger failure, the
charge air cooler should be flushed to make sure
the cooler is free of debris.
FLUSHING PROCEDURE
1. Remove the chassis-mounted cooler and
flush the inside with a safety solvent to
remove oil and other foreign debris.
2. Shake cooler to remove large pieces.
3. Wash with hot, soapy water. Rinse with
clean water and blow dry with compressed
air in the reverse direction of flow.
4. Carefully inspect cooler to ensure
cleanliness.
Do not use caustic cleaners when flushing the
cooler. Be extremely careful when handling the
cooler so as not to damage the core.
Damage
Core Failures
Recommended Repair
Procedure
System Check
Repairable
Bent cold fins
Straighten with small
screwdriver or pair of small
needlenose pliers.
Perform pressure/leak test.
Nonrepairable
All header tank-to-core
separations
No repair procedure is
recommended — replace
unit.
Perform pressure/leak test.
All header tank cracks
No repair procedure is
recommended — replace
unit.
Perform pressure/leak test.
Internal fins damaged and
separated from tube plate
No repair procedure is
recommended — replace
unit.
Perform pressure/leak test.
Tube blockage
No repair procedure is
recommended — replace
unit.
Perform pressure/leak test.
Tube/plate cracks or welds,
cold bar separations or
openings
No repair procedure is
recommended — replace
unit.
Perform pressure/leak test.
Excessive cold fin damage
(original shape of fins
distorted beyond repair)
No repair procedure is
recommended — replace
unit.
Perform pressure/leak test.
5-111.bk Page 103 Monday, July 10, 2006 2:26 PM
Содержание ASET AC
Страница 6: ...TABLE OF CONTENTS Page iii TABLE OF CONTENTS 5 111 bk Page iii Monday July 10 2006 2 26 PM...
Страница 14: ...INTRODUCTION Page 1 INTRODUCTION 5 111 bk Page 1 Monday July 10 2006 2 26 PM...
Страница 23: ...Page 10 NOTES 5 111 bk Page 10 Monday July 10 2006 2 26 PM...
Страница 24: ...VISUAL IDENTIFICATION Page 11 VISUAL IDENTIFICATION 5 111 bk Page 11 Monday July 10 2006 2 26 PM...
Страница 28: ...DESCRIPTION AND OPERATION Page 15 DESCRIPTION AND OPERATION 5 111 bk Page 15 Monday July 10 2006 2 26 PM...
Страница 96: ...COMPONENT LOCATOR Page 83 COMPONENT LOCATOR 5 111 bk Page 83 Monday July 10 2006 2 26 PM...
Страница 99: ...Page 86 NOTES 5 111 bk Page 86 Monday July 10 2006 2 26 PM...
Страница 100: ...TROUBLESHOOTING Page 87 TROUBLESHOOTING 5 111 bk Page 87 Monday July 10 2006 2 26 PM...
Страница 140: ...MAINTENANCE Page 127 MAINTENANCE 5 111 bk Page 127 Monday July 10 2006 2 26 PM...
Страница 153: ...Page 140 NOTES 5 111 bk Page 140 Monday July 10 2006 2 26 PM...
Страница 154: ...REPAIR INSTRUCTIONS PART 1 Page 141 REPAIR INSTRUCTIONS PART 1 5 111 bk Page 141 Monday July 10 2006 2 26 PM...
Страница 383: ...Page 370 NOTES 5 111 bk Page 370 Monday July 10 2006 2 26 PM...
Страница 384: ...REPAIR INSTRUCTIONS PART 2 Page 371 REPAIR INSTRUCTIONS PART 2 5 111 bk Page 371 Monday July 10 2006 2 26 PM...
Страница 454: ...REPAIR INSTRUCTIONS PART 3 Page 441 REPAIR INSTRUCTIONS PART 3 5 111 bk Page 441 Monday July 10 2006 2 26 PM...
Страница 479: ...Page 466 NOTES 5 111 bk Page 466 Monday July 10 2006 2 26 PM...
Страница 480: ...SPECIFICATIONS Page 467 SPECIFICATIONS 5 111 bk Page 467 Monday July 10 2006 2 26 PM...
Страница 505: ...Page 492 NOTES 5 111 bk Page 492 Monday July 10 2006 2 26 PM...
Страница 506: ...SCHEMATIC ROUTING DIAGRAMS Page 493 SCHEMATIC ROUTING DIAGRAMS 5 111 bk Page 493 Monday July 10 2006 2 26 PM...
Страница 513: ...Page 500 NOTES 5 111 bk Page 500 Monday July 10 2006 2 26 PM...
Страница 514: ...SPECIAL TOOLS EQUIPMENT Page 501 SPECIAL TOOLS EQUIPMENT 5 111 bk Page 501 Monday July 10 2006 2 26 PM...
Страница 519: ...Page 506 NOTES 5 111 bk Page 506 Monday July 10 2006 2 26 PM...
Страница 520: ...APPENDIX Page 507 APPENDIX 5 111 bk Page 507 Monday July 10 2006 2 26 PM...
Страница 528: ...INDEX Page 515 INDEX Index fm Page 515 Monday July 10 2006 2 48 PM...
Страница 535: ...Page 522 NOTES Index fm Page 522 Monday July 10 2006 2 48 PM...