NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
17
Table 3-4
Electrical installation tools
Appearance, Specifications, and Name
ESD gloves
Insulation gloves
Wire stripper
Polyvinyl chloride
(PVC) insulation
tape
Heat gun
power cable
crimping tool
N/A
N/A
N/A
N/A
Table 3-5
Commissioning tools
Appearance, Specifications, and Name
Pressure gauge (2
PCS)
a
Charging hose (5
PCS)
a
Vacuum pump
Thermocouple
temperature sensor
Clamp meter
Electric balance
Protective gloves
Multimeter
a: Two pieces of the pressure gauge and the charging hoses must meet requirements of
R410A refrigerant and the charging hoses can withstand pressure more than 4.0 MPa.
Ensure that the charging hoses match with the 1/4 inch needle valves used in the system
and configure connectors if required.
3.1.2 Material Preparations
Configuration
Materials are classified to Huawei-provided, self-purchased, and onsite prepared materials as
follows.