NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
29
Only trained personnel are allowed to move the cabinet. Use a pallet truck to transport the
cabinet secured to a wooden support to the installation position. Insert the forks of the
pallet truck in the middle position to ensure balance.
To prevent the cabinet from falling over, secure it to a pallet truck using ropes before
moving it.
When loading and unloading the cabinet, keep the gradient within 15 degrees, as shown in
Figure 3-9
.
To prevent shocks or falls, move the cabinet gently.
After placing the cabinet in the installation position, unpack it and take care to prevent
scratches. Keep the cabinet steady during unpacking.
Figure 3-9
Transportation Gradient
Procedure
Step 1
Visually inspect the outer packing for shipping damage. If any shipping damage is founded,
report it to the carrier immediately.
Step 2
Unpack the package.
1.
Remove the straps, top cover, outer packing, cushioning material, and adhesive tape, as
shown in
Figure 3-10
.