NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
4 Power-On Commissioning
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
65
Never move the hose or steel vessel during refrigerant charging. Otherwise, the value on the
electronic balance is influenced.
Step 5
Refrigerant should be charged in liquid based on the calculated amount.
Step 6
Close the pressure gauges and the valve of the steel vessel after charging in refrigerant.
----End
4.3 Power-on Preparations
Prerequisites
In the container data center scenario, when the indoor unit is not connected to the outdoor unit
before being powered on and no compressor needs to be configured, remove the screws fixing
the X115 terminals below the electrical control box using a Philip screwdriver and plug out
the terminals, as shown in
Figure 4-3
. If the compressor is required, reinstall the X115
terminals. (Note that removing and installing terminals must be performed when the
equipment is powered off.)