Port layout
Figure 3-27
Port layout on the electrical control box
(1) J73 for teamwork networking
and host monitoring (J73)
(2) X106 signal terminals for connecting to the
indoor and outdoor units and water leakage sensor
(3) Ports for power cables
(4) JMP, voltage jumper port
3.8.2 Connecting Power Cables
Context
Route power cables from the bottom or the top.
For how to choose circuit breakers and cables, see
3.1.2 Material Preparations
.
Procedure
Step 1
Connect L1, L2, L3, N, and PE terminals to the corresponding power ports, as shown by 1 in
Figure 3-28
.
Step 2
Route a ground cable from the equipotential terminal of the indoor unit to the nearly ground
bar of the equipment room, as shown by 2 in
Figure 3-28
.