NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
28
Figure 3-8
Vertical installation layouts of outdoor units
(1) Tilted gas pipeline
(2) Inverted trap
(3) Oil trap
(4) Tilted liquid pipe
The specifications for oil trap inverted trap can be prepared by referring to
Oil Trap and Inverted
Trap Preparations
in chapter
3.1.2 Material Preparations
.
In the figure,
is a sign of a tilt, indicating that the scale of the pipe tilting is at least 1:200.
The pipe tilting direction should be consistent with the hypotenuse of the right triangle.
3.2 Transportation and Unpacking
Prerequisites