NetCol5000-A020 Air Cooled In-row Precision Air
Conditioner
User Manual
3 Installation Guide
Issue 01 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
51
Figure 3-31
Routing signal cables for outdoor unit On/Off signal and water sensor
3.8.4.2 Connecting Outdoor Unit On/Off Signal Cable
Procedure
Step 1
Route the signal cables through the cable protecting ring on the top or at the bottom of the
cabinet and the upper or lower cable hole on one side of the electrical control box.
Step 2
Connect the terminals 05 and 06 on the control terminal X106 port and terminals 1B/2B and
1A/2A of the outdoor unit.
Figure 3-31
shows routing of the signal cable.
Step 3
Fix the cables with cable ties.
----End