−
−
−
−
−
−
−
−
*01
01
02
03
YES
NO
YES
NO
YES
NO
YES
NO
11-198
Idle Control System
PSP Switch Signal Circuit Troubleshooting (cont’d)
JUMPER WIRE
PSPSW (GRN)
GND (BLK)
PSP SWITCH 2P CONNECTOR
GND (BLK)
PSP SWITCH 2P CONNECTOR
PCM CONNECTORS
A (31P)
E (31P)
LG1 (BRN/BLK)
PSPSW(GRN)
PCM CONNECTOR E (31P)
PSPSW (GRN)
9. At the harness side, connect PSP switch 2P
connector terminals No. 1 and No. 2 with a jumper
wire.
10. Measure voltage between PCM connector
terminals A26 and E20.
Replace the PSP switch.
Go to step 11.
11. Turn the ignition switch OFF.
12. Check for continuity between PSP switch 2P
connector No. 2 terminal and body ground.
Repair open in the wire between the PSP
switch and PCM (E20).
Repair open in the wire between the PSP
switch and G201.
13. Turn the ignition switch OFF.
14. Disconnect the PSP switch 2P connector.
15. Turn the ignition switch ON (II).
16. Measure voltage between PCM connector
terminals A26 and E20.
Replace the PSP switch.
Go to step 17.
17. Turn the ignition switch OFF.
18. Disconnect PCM connector E (31P).
19. Check for continuity between body ground and
PCM connector terminal E20.
Repair short in the wire between the PCM
(E20) and the PSP switch.
Substitute a known-good PCM and recheck
(see page 11-5). If voltage is normal, replace the
original PCM.
Wire side of female terminals
Wire side of female terminals
Wire side of female terminals
Wire side of female terminals
Is ther e less than 1.0 V ?
Is ther e continuity?
Is ther e batter y voltage?
Is ther e continuity?
03/07/29 09:23:14 61S0X050_110_0198
Содержание 2004 Odyssey
Страница 33: ......
Страница 59: ......
Страница 101: ...4 14 Ignition System Component Location Index IGNITION COIL SPARK PLUG Replacement page 4 17 Inspection page 4 18...
Страница 145: ......
Страница 167: ......
Страница 229: ......
Страница 259: ......
Страница 283: ......
Страница 309: ......
Страница 402: ...99 00 models 01 model 11 93 INJECTORS INJECTORS cont d Replacement page 11 177 Replacement page 11 177...
Страница 529: ...02 04 models 11 220 Fuel Supply System Fuel Line Inspection cont d 37 N m 3 8 kgf m 27 lbf ft 22 N m 2 2 kgf m 18 lbf ft...
Страница 613: ...03 07 29 09 29 07 61S0X050_140_0003...
Страница 1097: ......
Страница 1119: ......
Страница 1363: ......
Страница 1527: ...Top View 20 162 Frame Frame Repair Chart...
Страница 1528: ...20 163 cont d...
Страница 1529: ...Side View 20 164 Frame Frame Repair Chart cont d...
Страница 1530: ...20 165...
Страница 1594: ...21 63...
Страница 1606: ...21 75...
Страница 1677: ......
Страница 1692: ...22 13 Roof REAR CONTROLLER and SCREEN With rear entertainment system...
Страница 1696: ...22 17 1 2 BATTERY GROUND CABLE 3 4 5 6 ENGINE GROUND CABLE STARTER CABLE...
Страница 1732: ...22 53 RIGHT SIDE WIRE HARNESS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30...
Страница 2025: ......
Страница 2439: ......
Страница 2459: ......