5
5
5-2
5-2
Adjustment > Overview
Adjustment > Overview
Overview
In this chapter, measures of adjustment when replacing parts in servicing operation are
mentioned. Parts to be replaced are categorized into 5 blocks based on their related
technology as shown below.
Category
Part to be replaced
Reference
Controller system
Main controller PCB
Laser control system
Laser scanner unit
Imaging system
Primary charging assembly, Primary charging wire, Grid
wire
Pre-primary transfer charging assembly, Pre-primary
transfer charging wire
Developing assembly, Developing sleeve unit
Photo-sensitive drum unit
ITB
Patch sensor
Pickup / Feed system
Skew detection sensor
Skew roller, skew driven roller
CIS sensor
Image standard sensor, post-registration sensor, pre-
registration sensor
Registration roller, registration driven roller
Active registration unit
Various rollers
During deck open/close solenoid replacement or latch
claw position change
Paper surface sensor
Air floatation fan/fan duct
Exterrnal auxiliary system DC controller PCB
T-5-1
Содержание imagePRESS 1110
Страница 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Страница 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Страница 733: ...7 7 Error Code Error Code Overview Location Code Pickup Position Code Pickup size Error Code Jam Code Alarm Code ...
Страница 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Страница 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...