9
9
9-106
9-106
Installation > Voice Guidance Kit-E1 > Installation Procedure
Installation > Voice Guidance Kit-E1 > Installation Procedure
Turning OFF Host Machine
Refer to CAUTION : Points to note when turning OFF the main power switch in installation of the host machine.
Installation Procedure
1) Install the speaker unit (lower) to the speaker unit (upper).
• 1 screw (binding; M4x6)
x1
F-9-217
2) Remove the backing tape of double-sided tape and put it on the
below position of speaker unit.
F-9-218
3) Remove the backing tape of speaker seal and put it on the
below position of speaker unit.
F-9-219
4) Remove the voice board support plate.
• 2 screws (removed screw will be used in step 5).)
MEMO:
Removed voice board will not be used.
x2
F-9-220
5)Install the included voice board support plate.
• 2 screw (the screws removed in step 4).)
x2
F-9-221
Содержание imagePRESS 1110
Страница 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Страница 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Страница 733: ...7 7 Error Code Error Code Overview Location Code Pickup Position Code Pickup size Error Code Jam Code Alarm Code ...
Страница 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Страница 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...