Points to note when installing the Primary Charging Assembly
Be sure to perform the following operation before installing the Primary Charging Assembly to the host machine.
1) Make sure that the protrusion [A] area of Cleaning Pad Arm and the lead edge [B] area of Primary Anti-vibration Sheet are fitted into the groove of the frame on Primary Charging Assembly. If not, fit the [A]
area and [B] area into the groove of the frame.
[A]
[B]
F-4-304
MEMO :
• If the protrusion [A] area of Cleaning Pad Arm is not fitted into the groove of the frame,
the Cleaning Pad Arm cannot move to the front of the Primary Charging Assembly and
Cleaning Pad movement detection error: E060-0101 (E060-0102) will occur.
• If the lead edge [B] area of Primary Anti-vibration Sheet is not fitted into the groove of
the frame, Primary Charging Wire will not be cleaned evenly.
2) Turn the gear and move the Cleaning Pad Arm to the front.
Cleaning Pad Arm
Gear
F-4-305
Содержание imagePRESS 1110
Страница 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Страница 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Страница 733: ...7 7 Error Code Error Code Overview Location Code Pickup Position Code Pickup size Error Code Jam Code Alarm Code ...
Страница 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Страница 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...