9
9
9-34
9-34
Installation > Installation > Removing the transportation packing member of the ITB unit
Installation > Installation > Removing the transportation packing member of the ITB unit
6) Push the ITB unit to the host machine.
7) Install it while holding the ITB positioning plate.
• 2 screws (use the screws removed in
step 1) at “Removing the transportation
packing member of the process unit”)
8) Push the fixing feed unit to the host machine.
9) Turn the lever of the fixing feed unit clockwise
to lock.
10) Lift the primary charging cleaning motor unit
and install the primary charging assembly.
11) Turn the ITB pressure lever clockwise to make the ITB belt engaged.
CAUTION :
Be sure to make the
ITB belt engaged here,
otherwise the ITB can
be damaged.
F-9-74
12) Insert the protrusion and install the process unit cover.
• 2 stepped screws (with yellow screw head) (for process unit cover) (M4)
NOTE :
• Cut the tap by the screw thread of
stepped screw and tighten the screw.
• Once the stepped screw is installed,
it won’t come off.
x1
x2
F-9-75
Содержание imagePRESS 1110
Страница 242: ...3 3 Periodical Service Periodical Service Periodical service item ...
Страница 655: ...5 5 Adjustment Adjustment Overview When replacing parts Major adjustment ...
Страница 733: ...7 7 Error Code Error Code Overview Location Code Pickup Position Code Pickup size Error Code Jam Code Alarm Code ...
Страница 944: ...8 8 Service Mode Service Mode Overview COPIER FEEDER SORTER BOARD Situation Mode ...
Страница 1555: ... Service Tools General Circuit Diagram General Timing Chart Operator Maintenance Appendix ...