57
Chapter 2
Virtual Chassis Stacking
The sections in this chapter are listed here:
“Trunks of Ports S1 and S2” on page 60
“Trunks of AT-StackQS Cards” on page 64
“Trunks of Copper 10/100/1000Mbps Ports” on page 67
“Trunks of SFP Ports on AT-x930-28GSTX Switches” on page 69
“General Stacking Guidelines” on page 72
“Master and Member Switches” on page 73
“Switch ID Numbers” on page 74
“Specifying Ports in the Command Line Interface” on page 76
Note
For more information on VCStack, refer to the
Stacking Introduction
and Stacking Commands
chapters in the
Software Reference for
x930 Series Switches, AlliedWare Operating System
from
www.alliedtelesis.com
.
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...