x930 Series Installation Guide for Virtual Chassis Stacking
95
Figure 33. Removing the Blank Panel
3. Unpack the power supply from its shipping container.
Caution
The device is heavy. Use both hands to lift it. You might injure
yourself or damage the device if you drop it.
E94
4. Check the shipping container for the accessory items.
Refer to Table 19 on page 96 to determine the accessory items that
come with your power supply.
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...