x930 Series Installation Guide for Virtual Chassis Stacking
81
Firmware Version
Number
Use this column to record the version numbers of
the AlliedWare Plus management software on
the switches. The switches might not be able to
form the stack if they have different versions.
Switches that have different versions should be
updated to the most recent release before you
build the stack. The configuration instructions
explain how to view the version numbers.
Trunk Ports
Use this column to enter the trunk ports. You
should choose the ports before beginning the
configuration procedures. Refer to “Stack Trunks”
Transceivers
Used this column to record the types of
transceivers in ports 25, 26, 27/S1, and 28/S2 of
28-port switches and ports 49, 50, 51/S1, and 52/
S2 of 52-port switches.
AT-x9EM/XT4 or
AT-StackQS Card
Use this column to enter the names of expansion
cards in the switches.
Table 18. Stacking Worksheet Columns (Continued)
Column
Description
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...