x930 Series Installation Guide for Virtual Chassis Stacking
19
Front and Back Panels
The front panels of the x930 Series switches are shown in Figure 1 and
Figure 1. Front Panels of the AT-x930-28GTX and AT-x930-28GPX
Switches
AT-x930-28GPX
AT-x930-28GTX
10/100/1000Base-T Ports
SFP or SFP+ Ports
Management
Panel
SFP, SFP+ or
Stacking Ports
SFP or SFP+ Ports
Management
Panel
SFP, SFP+ or
Stacking Ports
10/100/1000Base-T Ports
with PoE+
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...