Chapter 3: Beginning the Installation
90
Unpacking the Switch
Figure 31 lists the items in the accessory kit that comes with the switch. If
any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
Figure 31. Accessory Kit
Four equipment rack or wall
mounting brackets
One 2 m (6.6 ft) local management
cable with RJ-45 (8P8C) and DB-9 (D-
sub 9-pin) connectors.
Sixteen bracket screws
Seven bumper feet
One AT-PNL800/1200 blank
panel
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...