x330 Series Installation Guide for Virtual Chassis Stacking
155
To have the switches assign the ID numbers automatically, perform the
following procedure:
1. Cable the SFP+ ports S1 and S2 ports on the switches of the stack.
For guidelines and examples, refer to “Trunks of Ports S1 and S2” on
page 60. For cabling instructions, refer to Chapter 14, “Cabling the
Networking Ports” on page 185.
2. Power on all the switches of the stack simultaneously:
For switches with AC power supplies, connect the AC power cords
to the power supplies on the back panels and to AC power
sources.
For switches with DC AT-PWR250-80 Power Supplies, power on
the DC circuits and the On/Off switches on the power supply. (For
wiring instructions, refer to Chapter 9, “Wiring the DC Connector on
the AT-PWR250-80 Power Supply” on page 137.)
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.
E3
3. Wait three minutes for the switches to select the master switch and for
the master switch to assign ID numbers to the member switches.
The stack is now operational. The switches retain their ID numbers
even when reset or powered off.
4. Go to “Verifying the Stack and Assigning Priority Numbers” on
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...