Chapter 5: Installing AT-StackQS and AT-x9EM/XT4 Cards
112
14. If you purchased AT-StackQS Cards for other sx930 Switches, repeat
this procedure to install the cards.
15. Do one of the following:
To install the switch on a table, go to Chapter 6, “Installing the
Switch on a Table” on page 113.
To install the switch in an equipment rack, refer to Chapter 7,
“Installing the Switch in an Equipment Rack” on page 115.
To install the switch on a wall, refer to Chapter 8, “Installing the
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...