Chapter 14: Cabling the Networking Ports
190
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining transceivers in the switch.
5. Remove the dust cover from the transceiver. Refer to Figure 86.
Figure 86. Removing the Dust Cover from an SFP or SFP+ Transceiver
6. Verify the position of the handle on the transceiver. If the transceiver is
in a top port, the handle should be in the upright position, as shown in
Figure 87. If the transceiver is in a bottom port, the handle should be in
the down position.
Figure 87. Positioning the SFP or SFP+ Handle in the Upright Position
7. Connect the fiber optic cable to the transceiver, as shown in Figure 88
on page 191. The connector on the cable should fit snugly into the
port, and the tab should lock the connector into place.
SFP Handle
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...