x930 Series Installation Guide for Virtual Chassis Stacking
91
Figure 32 lists the items that come pre-installed in the switch.
Figure 32. Pre-installed Items
Note
You should retain the original packaging material in the event you
need to return the unit to Allied Telesis.
Note
The product does not come with power supplies. Power supplies
must be ordered separately.
One AT-PNL800/1200 or AT-
PNL250 blank panel on the
back panel
Four dust covers in the SFP+
ports on the front panel
One AT-FAN09 Fan Module in
the back panel
One AT-FAN09ADP Module in
the back panel
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...