Chapter 13: Building the Stack with Copper or SFP Gigabit Ports
176
What to Do Next
After configuring the master switch, do the following:
1. Power off the switch. For AC power supplies, disconnect the AC power
cords from the AC power sources. For DC power supplies, turn off the
ON/OFF switch on the power supplies or power off the DC power
circuits.
2. Configure the member switches. Refer to “Configuring the Member
3. After configuring the master switch and all member switches, build the
stack by cabling the trunk Gigabit ports on the switches. Refer to
“Cabling Copper Ports” on page 186 or “Installing SFP and SFP+
4. Power on the master and member switches of the stack. Refer to
“Powering on the Stack” on page 184.
5. Verify that the switches formed the stack by performing “Verifying the
Stack and Assigning Priority Numbers” on page 156.
6. Cable the networking ports. Refer to Chapter 14, “Cabling the
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...