Chapter 7: Installing the Switch in an Equipment Rack
120
Figure 55. Installing the Switch in an Equipment Rack
4. Repeat this procedure if there are other switches to be installed in an
equipment rack.
5. Do one of the following:
If you have not installed the power supplies yet, go to Chapter 4,
“Installing the Power Supplies” on page 93.
If any of the switches contain the AT-PWR250-80 DC Power
Supply, go to Chapter 9, “Wiring the DC Connector on the AT-
PWR250-80 Power Supply” on page 137.
Otherwise, go to Chapter 10, “Displaying the AlliedWare Plus
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...