Chapter 4: Installing the Power Supplies
94
Installing the Power Supplies
This section contains the procedure for installing the power supplies in the
switch. If you are planning to install the switch in an equipment rack or on
a wall, it may be easier to install the power supplies first.
Caution
The device can be damaged by electrostatic discharge (ESD). Be
sure to follow standard ESD protections procedures, such as
wearing a wrist or foot strap, when installing the device.
E106
Caution
The switch is heavy. Always ask for assistance when moving or
lifting the device so as to avoid injuring yourself or damaging the
equipment.
The illustrations in the following procedure show the AT-PWR800 Power
Supply. The procedure is the same for all power supplies.
To install the power supplies, perform the following procedure:
1. Place the switch on a level, secure table or desk.
Note
If you are installing only one power supply, skip step 2.
2. Use a cross-head screwdriver to loosen the two captive screws on the
blank panel covering power supply slot B on the back panel and
remove it from the switch. Refer to Figure 33 on page 95.
Note
Allied Telesis recommends removing the blank panel from slot B
even if you are installing only one power supply, You reinstall the
panel later in the procedure.
Содержание AT-x930-28GPX
Страница 8: ...Contents 8...
Страница 12: ...Tables 12...
Страница 16: ...Preface 16...
Страница 82: ...Chapter 2 Virtual Chassis Stacking 82...
Страница 92: ...Chapter 3 Beginning the Installation 92...
Страница 102: ...Chapter 4 Installing the Power Supplies 102...
Страница 118: ...Chapter 7 Installing the Switch in an Equipment Rack 118 Figure 53 Attaching the Equipment Rack Brackets...
Страница 124: ...Chapter 8 Installing the Switch on a Wall 124 Figure 58 Minimum Wall Area Dimensions with the Front Panel on the Right...
Страница 214: ...Appendix A Technical Specifications 214...