
6.2.1 Mounting a Back Tamper Kit
6.2.2 Battery installation for EN50131 compliance
6.3.2 Mounting the housing with tamper protection
6.3.3 Installing the batteries
7.1.3 Wiring the X-BUS Interface
7.1.4 Compliance with NF and A2P approvals including CYBER requirements
8.1 Controller Hardware 42xx/43xx/53xx/63xx
8.2 Controller Hardware SPC5350 and 6350
10.1 Wiring the X-BUS interface
10.1.3 Star and multi-drop configuration
10.2 Wiring of branch expander
10.6 Wiring an external SAB bell
10.7 Wiring an internal sounder
10.9 Installing plug-in modules
11 Powering up the SPC controller
11.1 Powering from battery only
SPC4xxx/5xxx/6xxx – Installation & Configuration Manual
Table of Contents
© Vanderbilt 2018
4
A6V10276959-d
11.2018