A02382
E1 (-)
+B (+)
BE6653
P23885
-
DIAGNOSTICS
ENGINE
DI-145
299
Author:
Date:
2001 SIENNA (RM787U)
INSPECTION PROCEDURE
1
Check voltage between terminals
+
B and E1 of ECM connectors.
PREPARATION:
(a)
Remove the glove compartment (See page
).
(b)
Turn the ignition switch ON.
CHECK:
Measure voltage between terminals
+
B and E1 of the ECM
connectors.
OK:
Voltage: 9 - 14 V
OK
Proceed to next circuit inspection shown on
problem symptoms table (See page
NG
2
Check for open in harness and connector between terminal E1 of ECM and body
ground (See page
).
NG
Repair or replace harness or connector.
OK
3
Check EFI main relay (Marking: EFI) (See page
NG
Replace EFI main relay.
OK
4
Check EFI fuse (See page
).
NG
Check for short in all the harness and
components connected to EFI fuse.
OK