3‑10
2. Assembling
Assembling procedure is the reverse of the above.
3. Cautions
1)
Electric power should be off before the maintenance.
-
If connecting or disconnecting while power is ON,
electronic parts may be damaged by electric shock.
2)
Do not hold STM arm when lifting up the unit.
- The probe may be distorted if touched.
3)
When removing M6 joint, wipe off the water flown from tube, before
moving the tube to the bottom of unit.
- If water is carried into STM section, electric parts such as sensors
may be damaged.
Summary of Contents for Labmax 240
Page 1: ...Automated Clinical Analyzer Service Manual Version 1 44 TOKYO BOEKI LTD...
Page 12: ......
Page 18: ......
Page 40: ...2 8 2 4 Reagent Dispensation Process Fig 2 4 Reagent Dispensation Process 1 2...
Page 41: ...Service Manual Chapter 2 2 9 Fig 2 5 Reagent Dispensation Process 2 2...
Page 44: ...2 12 Fig 2 7 Sample Dispensation Process 2 2...
Page 46: ......
Page 110: ......
Page 140: ......