Operation Procedure
Use the
temperature
measuring
fun
YES
YES
Use the pressure
measuring function
Fill Priming Solution
Preparing Circulation
The preparation steps for circulation are shown below.
page 43
page 43
page 44
page 46
page 47
page 48
page 49
page 46
page 46
page 125
page 50
page 51
Continue to “Starting
Circulation”
page 55
42
YES
Use the pressure
measuring function
YES
Use the Fast
Clamp
Inspection Before Circulation
Starts (Before Each Use)
Auto-priming
Confirm the Setup
Turn the Power On
Attach the ABD/Flow Sensor
Attach the Centrifugal Pump to
the Drive Motor
Centrifugal Pump Connection
to the Tube Pack
ction
NO
Attach the Temperature Sensor
(CAPIOX Luer Thermistor)
NO
Attach the Pressure Sensor
NO
Calibration of the Pressure Sensor
NO
Attach the Fast Clamp
Summary of Contents for CAPIOX EBS Circuit with X coating
Page 1: ...CAPIOX Emergency Bypass System Instructions for use...
Page 4: ...CAPIOX EBS Circuit with X coating Instructions for use...
Page 8: ...Structure Structure...
Page 25: ...EBS and X coating are trademarks of TERUMO CORPORATION 2019 XX...
Page 26: ...CAPIOX EBS Cannula Kit with X coating Instructions for use...
Page 29: ...CAPIOX Centrifugal Pump Controller SP 200 Instructions for use...
Page 175: ...Memo 146...
Page 176: ...147 Memo...