![background image](http://html1.mh-extra.com/html/rmg/erz2000-ng/erz2000-ng_operating-manual_1467424084.webp)
2 Introduction
Manual ERZ 2000-NG · EN07 · 2019, May 13th
74
2.5.5.4
Revision
Figure 61: "Revision" sub-menu under "Functions"
The quantities and measurements are recorded and displayed for a defined length of
time in the functional test. The revision is divided into a run-up, the actual test and an
after-run.
Revision process:
1.
Enter four times for the three sections of the revision.
2.
Click on "Start Time1". Then the revision is run according to the four times. Times
that have already elapsed are highlighted green.
3.
The result can be read in the green highlighted table to the right. You can switch
back and forth between the tables for run-up, test and after-run with "Change".
Alternatively, the times for test time, run-up and after-run, as well as a delay time can
be entered. The results of the revision are also saved in archive groups 17 to 20.
The revision can be carried out at the same time in a partner device (ERZ2000 or
ERZ2000-NG) which is connected to the same DSfG bus. For this purpose, the ap-
propriate DSfG address of the partner device must be entered.
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...