Appendix
Manual ERZ 2000-NG · EN07 · 2019, May 13th
387
Turbine meter
Turbine meter with integrated NAMUR separator stage (optional)
ERZ 2000-NG
Connector
TRZ 03
T 1
TA 1
Connector
X 8
Connector
TA 1
Connector
T 1
7
8
PE
1
+
-
2
3
1*
8
7
HF3
9
10
9
8
+
-
3
1*
2
1
HF2
PE
Ref. (HFY)
Meas. (HFX)
* valid for 3-pin connectors,
for all others: pin 6
ERZ 2000-NG
Connector
TRZ 03
Connector
X 9
3
4
PE
+
-
3
1*
HF3
5
6
+
-
3
1*
HF2
Ref. (HFY)
Meas. (HFX)
* valid for 3-pin connectors,
for all others: pin 6
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...