3 Electrical connections
Manual ERZ 2000-NG · EN07 · 2019, May 13th
133
3.1.16 NY Resistance measuremnt 3
Figure 95: Menu NY Resistance measurement input 3
The additional
NY Resistance measurement 3
becomes possible with use of the Ex
board.
NZ Resistance measurement 4
can also be used with the 2nd Ex board.