1 About this manual
Manual ERZ 2000-NG · EN07 · 2019, May 13th
7
Note
In accordance with Article 15 of the German Ordinance on Industrial Safety
and Health (BetrSichV), Article 5 of German Social Accident Insurance
(DGUV) REGULATION 3 "Electrical systems and equipment” and generally
recognized good engineering practices, particularly the VDE standards VDE
0100-100 "Construction of low-
voltage systems” and VDE 0165 "Electrical
explosion protection”, an inspection of the measuring system must be car-
ried out before the device is commissioned.
An acceptance test certificate must be created during the commissioning.
This, the operating manual and the CE Declaration of Conformity must be
stored so that they are always readily available. In the process, the entire
documentation, including the conformity declarations and certificates must
be checked for completeness.
All sharp edges on the device were removed, insofar as possible. However,
suitable personal protective equipment provided by the operator must be
worn during all work.
Danger
This symbol is used in the manual as a warning of the danger of
explosion; observe the instructions following the symbol. With
the danger of explosion, the following must be observed, in par-
ticular:
The flow computer ERZ2000-NG is
not
approved or designed for use in explosion-
prone areas. Installation must only take place in safe rooms. The ERZ2000-NG is
intended for installation in a control cabinet in an electronics room.
Install the device as specified in the operating manual. If the device is not installed as
specified in the operating manual, there may be a risk that other connected devices
have adequate explosion protection.
Inadequately qualified persons working on the equipment are unable to correctly es-
timate dangers. Explosions can be triggered. Only work on the equipment if you have
the appropriate qualifications.
Components can be damaged if you do not use suitable tools and materials. Only
use tools that are recommended for the respective work in the operating manual.
Mechanical installation
Mechanical installation must only be performed by appro-
priately qualified technicians.
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...