Appendix
Manual ERZ 2000-NG · EN07 · 2019, May 13th
351
Appendix
A.1
Second PT100
Note
A second resistance input is available as an alternative to
current outputs 7 and 8!
Installation
x
Remove the housing cover.
x
The hardware, the base circuit board, must be configured with
Strips X23 / X45
(in
Figure 253: ERZ2000-NG printed circuit board
left rear in the device, be-
tween module slot 1 and 2).
Figure 253: ERZ2000-NG printed circuit board
x
Install
soldering bridge circuit board
with the correct orientation. The text
for a second PT 100 must be on the head when viewing the soldering bridge
circuit board from the front panel.
Front panel
Rear wall
X23 / X45
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...