Appendix
Manual ERZ 2000-NG · EN07 · 2019, May 13th
360
.A.5.6 FG Hardware test
Figure 259: Menu FG Hardware test
In normal operation and/or during the measurement, "no" is activated in coordinate
FG01 Active
. "yes" is selected during a hardware test or a simulation. The display
test is initiated with coordinates
FG05
and
FG06
(not shown here). Coordinates
FG02 Alarm contact
to
FG09 Warning LED
show the statuses of the LEDs and
the alarm, warning and contact outputs in a simulation.
FG13 HFX-Test totalizer
to
FG 15 HFX-HFY-diff
. display
–
if available
–
the already issued and counted
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...