1 About this manual
Manual ERZ 2000-NG · EN07 · 2019, May 13th
6
Note
The flow computer ERZ2000-NG is approved for officially certified operation.
For this purpose, it is sealed before deliver and settings specified by the ap-
proval authority are blocked.
These seals, software or hardware locks must not be damaged, destroyed or
removed!
In this case, the ERZ2000-NG loses its official certification!
The ERZ2000-NG can only be approved for officially certified operation after a
renewed inspection by calibration officials and an additional inspection of ad-
ditional settings in the factory.
The calibration official must re-apply the seals and blockades.
Observe the following, in particular:
x
Modifications of the flow computer ERZ2000-NG are not permitted.
x
The technical specifications must be observed and followed for safe operation
(
chapter 3 Electrical connections
). Performance limits must not be exceeded.
x
The flow computer ERZ2000-NG must only be used in the scope of the in-
tended use (
chapter1.5 Areas of application)
x
The flow computer ERZ2000-NG complies with current standards and regula-
tions. However, danger can arise with misuse.
1.2.4.2
Dangers during commissioning
Initial commissioning
The initial commissioning must only be carried out by
specially trained personnel (training by RMG) or RMG
service personnel.
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...