6 Flow meters
Manual ERZ 2000-NG · EN07 · 2019, May 13th
248
6.5.1
GA Tube dimensions
Figure 183: Menu GA Tube dimensions
Menu GA Tube dimensions
enables settings of the orifice plate parameters (for the
ERZ2014-NG, ERZ2114-NG, ERZ2012-NG and ERZ2112-NG).
The neck is defined at 20°C in coordinates GA07 and GA08.
The temperature correction of the orifice plate diameter and the inside pipe diameter
takes place in accordance with VDI/VDE 2040, sheet 2 (chapter 10) of April 1987.
There are two calculation methods, one of which is based on the linear heat expan-
sion coefficient and the other is based on a proximity equation with coefficient selec-
tion depending on the materials for the orifice plate and pipe, which can be adjusted
in coordinates GA10 and GA11. The following table shows the selection options.
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...