2 Introduction
Manual ERZ 2000-NG · EN07 · 2019, May 13th
39
found under
AB Absolute pressure
. These "points" are referred to as "coordinates"
below. These individual coordinates are assigned additional meanings column-by-
column:
Col-
umn
1.
2.
3.
4.
5.
6.
Access col-
umn
Line num-
ber
Identification
Alpha-num.
Identifica-
tion
Numerical
identifica-
tion
Coordinate
name
Value Corre-
sponding
unit
Variable
Figure 23: Coordinate system
With
AB01 Measurement variable
, the coordinate is uniquely identified in the green
frame. The "Variable" column is only visible in Developer mode (see
Chapter 2.3 Ac-
cess protection for data and
settings
), for which the highest access level is required.
The variable identification
drka
establishes a unique identification for the physical var-
iable; this physical identification is assigned to the coordinate
AB01 Measurement
variable
.
If applicable, a coordinate can also be a function, then these designations can also
appear simultaneously.
The coordinates are arranged in a table, a coordinate system in the form of a matrix,
in which each column (also identified with menu) is identified with two letters and
each line is identified with a number. Furthermore, columns that belong together are
summarized in groups and each group has the same first letters, e.g. "A" for the
measurement columns. Each table as a (umbrella) term, or a heading, under which
all various points which have a logical connection with the term are summarized line
by line; for example, points such as "Unit", "Warning limit values", etc. are summa-
rized under the term "Absolute pressure". Chapters belonging together are summa-
rized under the first letters: AA, AB, AC, AD... / BA, BB, BC, ... / CA, CB, CC, CD.....
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...