Appendix
Manual ERZ 2000-NG · EN07 · 2019, May 13th
411
.J.2.3
Transgas Modbus
Coordinate
IB27 Modbus project
enables project-specific assignment of the
Modbus register upwards from 9000. For data exchange with a bus coupler for
Portugal, the Transgas setting must be chosen. This provides the following regis-
ter assignment:
Re-
gister
Bytes
Data type
Ac-
cess
Col-
umn
Line
Group
Description
Value (Dis-
play)
Value (Mod-
bus)
9000
4
float IEEE 754 R
AB
1
Absolute pres-
sure
Measurement
variable
25.000 bar
41 C8 00 00
9002
4
float IEEE 754 R
AC
1
Gas tempera-
ture
Measurement
variable
16.421568 °C 41 83 5F 5F
9004
4
float IEEE 754 R
HF
1
Operating flow
corr.
Measurement
variable
310.267 m3/h 43 9B 22 29
9006
4
float IEEE 754 R
HD
1
Standard vol-
ume flow
Measurement
variable
7718.06 m3/h 45 F1 30 79
9008
4
float IEEE 754 R
AD
1
Calorific value
Measurement
variable
12.000
kWh/m3
41 40 00 00
9010
4
float IEEE 754 R
AE
1
Standard densi-
ty
Measurement
variable
0.8880 kg/m3 3F 63 53 F8
9012
4
unsigned inte-
ger 32-bit
R
LB
4
Totalizer AM1 Energy
126843 MWh 00 01 EF 7B
9014
4
unsigned inte-
ger 32-bit
R
LB
7
Totalizer AM1 Op.vol. corr.
447724 m3
00 06 D4 EC
9016
4
unsigned inte-
ger 32-bit
R
LB
1
Totalizer AM1
Standard vol-
ume
9803707 m3 00 95 97 BB
9018
4
unsigned inte-
ger 32-bit
R
LC
4
Disturbance
totalizer AM1
Energy
21422 MWh 00 00 53 AE
9020
4
unsigned inte-
ger 32-bit
R
LC
7
Disturbance
totalizer AM1
Op.vol. corr.
92001 m3
00 01 67 61
9022
4
unsigned inte-
ger 32-bit
R
LC
1
Disturbance
totalizer AM1
Standard vol-
ume
1869267 m3 00 1C 85 D3
9024
4
signed integer
32-bit
R
FG
10
Hardware test Alarm LED
On
00 00 00 01
Options:
Off
= 0
On
= 1
blinking
= 2
9026
4
signed integer
32-bit
R
FG
9
Hardware test Warning LED
Off
00 00 00 00
Options:
Off
= 0
On
= 1
blinking
= 2
9028
2
unsigned inte-
ger 16-bit
R
YES
28
Error messages
Bits for regula-
tion
0000 hex
00 00
9029
2
unsigned inte-
ger 16-bit
R
KB
10
Time output
Modbus year
2010
07 DA
9030
2
unsigned inte-
ger 16-bit
R
KB
11
Time output
Modbus month 6
00 06
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...