3 Electrical connections
Manual ERZ 2000-NG · EN07 · 2019, May 13th
106
With internal Ex- separator stage Ex1-NAMUR-2 / V1 or V2:
(TÜV 06 ATEX 553139 X)
ERZ2002/2102-NG; terminal X 8 is assigned for frequency measurement:
X 8
Terminal 1 Signal input 6 + assignment takes place with software
Terminal 2 Signal input 6 - assignment takes place with software
Terminal 3 Signal input 7 + frequency input 5 density by software
Terminal 4 Signal input 7 - frequency input 5 density by software
Terminal 5 Signal input 8 + frequency input 6 standard density by software
Terminal 6 Signal input 8 - frequency input 6 standard density by software
Terminal 7 Signal input 9 + frequency input 7 standard density by software
Terminal 8 Signal input 9 - frequency input 7 standard density by software
Terminal 9 Signal input 10 + frequency input 8 VOS by software
Terminal 10 Signal input 10 + frequency input 8 VOS by software
ERZ2004/2104-NG; X 9 and X 10 are optionally assigned
X 9
Terminal 1 Ex-option enco + (Vo)
Terminal 2 Ex-option enco - (Vo)
Terminal 3 Ex-option Vb measuring channel (HFX) +
Terminal 4 Ex-option Vb measuring channel (HFX) -
Terminal 5 Ex-option Vb comparison channel (HFY) +
Terminal 6 Ex-option Vb comparison channel (HFX) -
Terminal 7 Ex-option pressure measurement - transmitter (optional HART)
Terminal 8 Ex-option pressure measu transmitter (optional HART)
Terminal 9 Ex-option temp. - transmitter (opt. HART) for PT 100 s. X 10
Terminal 10 Ex-option temp. + transmitter (opt. HART) for PT 100 s. X 10
X 10
Terminal 1 Reserve / free (Ex option for 2-rail version)
Terminal 2 Reserve / free (Ex option for 2-rail version)
Terminal 3 Reserve / free (Ex option for 2-rail version)
Terminal 4 Reserve / free (Ex option for 2-rail version)
Terminal 5 Reserve / free (Ex option for 2-rail version)
Terminal 6 Reserve / free (Ex option for 2-rail version)
Terminal 7 Ex-option PT 100 +
Terminal 8 Ex-option PT 100 sense +
Terminal 9 Ex-option PT 100 sense -
Terminal 10 Ex-option PT 100 supply - -
Summary of Contents for ERZ2000-NG
Page 10: ......
Page 68: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 58 Figure 44 Menu LA Overview...
Page 69: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 59 Figure 45 Menu LB Totalizer BM1...
Page 77: ...2 Introduction Manual ERZ 2000 NG EN07 2019 May 13th 67 Figure 51 Overview System sub menu...
Page 241: ...6 Flow meters Manual ERZ 2000 NG EN07 2019 May 13th 231 Figure 167 Interface module C34...
Page 340: ...8 Overview Coordinates Manual ERZ 2000 NG EN07 2019 May 13th 330 8 5 6 TSV export...
Page 453: ...Certificates Manual ERZ 2000 NG EN07 2019 May 13th 443...