Installing the Operating System and Utilities 4-7
Setup Flow
This section visually describes the flow of the setup operated by Express Setup.
Disk Array Configuration *1
↓
Restart
↓
Creating Recovery Partition
↓
Restart
↓
Installing Utilities
↓
Restart
↓
*2
Creating OS Partition
↓
Restart
↓
Formatting OS Partition
↓
Copying NEC Modules
↓
Copying Selected Application Modules
Read notes and restrictions.
Confirmed
Go back
Select how to install.
Yes
Insert floppy disk into the floppy disk drive.
Confirmed
Select Setup Parameter File.
No
Retrieve
again
Existing File
Select OS.
New File
Terminate
Check Setup Parameter File
If you need to
reset the
specification
Correct
Confirm the
setting/select whether
or not to modify.
Confirm the specification and input the value.
Re-select
OK
Incorrect
No
Yes
Insert Windows CD-ROM
After restarting the
computer, the installation
is completed.
Express Setup
↓
Log on Automatically
: Process that continues
automatically
: Process that requires input or
selection
Agree Software License Agreement
*1 Performed only when Disk Array Controller Board is installed and a RAID configuration is installed.
*2 If the operating system to be installed is [Others], Express Setup is completed here.
Summary of Contents for EXPRESS5800/120MF
Page 1: ... EXPRESS5800 120Mf U s e r s G u i d e ...
Page 2: ......
Page 4: ......
Page 12: ...x ...
Page 24: ...1 6 System Overview Rear View 11 9 10 12 13 14 15 16 2 17 15 18 17 16 1 8 7 6 1 2 3 4 5 2 5 1 ...
Page 58: ...1 40 System Overview This page is intentionally left blank ...
Page 59: ...Chapter 2 Setting Up Your Server This chapter describes how to set up your server ...
Page 202: ...4 62 Installing the Operating System and Utilities This page is intentionally left blank ...
Page 214: ...5 12 Maintenance This page is intentionally left blank ...
Page 229: ...Troubleshooting 6 15 Memory modules DIMM Group 3 DIMM Group 2 DIMM Group 1 ...
Page 304: ...7 50 Upgrading your Server This page is intentionally left blank ...
Page 305: ...Chapter 8 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 318: ...B 4 IRQ and I O Port Address This page is intentionally left blank ...
Page 326: ...C 8 Installing Windows 2000 This page is intentionally left blank ...
Page 340: ...10 Glossary This page is intentionally left blank ...
Page 345: ...xx ...
Page 346: ... ...