![background image](http://html.mh-extra.com/html/nec/express5800-120mf/express5800-120mf_user-manual_251193145.webp)
Installing the Operating System and Utilities 4-5
!
After completing Express Setup, see “Setup for Problem Resolution”
described later to configure your system to facilitate problem resolution
and recovery.
Installing on the Mirrored Volume
If you want to install Windows 2000 on the volume that has been mirrored using "Disk
Management", you must invalidate the mirror before re-installing the system on a basic disk, and
reconfigure the mirror after the installation has completed.
Management of a mirror volume can be performed from "Disk Management" under "Computer
Management". To access this window, open the "Control Panel" and select "Administrative Tools"
or right-click on the "My Computer" icon displayed on the desktop and select "Manage".
Connecting a Magnetic Optical (MO) Device
If you install Windows 2000 with an MO device connected to the system, the installation may not
be completed correctly. In this case, remove the MO device and then reinstall the system.
Connecting a Hard Disk
The hard disk drive that is to contain the OS can only be connected to a different SCSI controller
after the OS is installed on it.
Specifying Partition Size
The minimum size for the partition that the system is to be installed to can be calculated from the
following formula.
Paging File Size + Dump File Size
1000MB
= Size necessary to install the system
Paging File Size (Recommended) = Installed Memory Size X 1.5
Dump file Size
= Installed Memory Size + 12MB
Summary of Contents for EXPRESS5800/120MF
Page 1: ... EXPRESS5800 120Mf U s e r s G u i d e ...
Page 2: ......
Page 4: ......
Page 12: ...x ...
Page 24: ...1 6 System Overview Rear View 11 9 10 12 13 14 15 16 2 17 15 18 17 16 1 8 7 6 1 2 3 4 5 2 5 1 ...
Page 58: ...1 40 System Overview This page is intentionally left blank ...
Page 59: ...Chapter 2 Setting Up Your Server This chapter describes how to set up your server ...
Page 202: ...4 62 Installing the Operating System and Utilities This page is intentionally left blank ...
Page 214: ...5 12 Maintenance This page is intentionally left blank ...
Page 229: ...Troubleshooting 6 15 Memory modules DIMM Group 3 DIMM Group 2 DIMM Group 1 ...
Page 304: ...7 50 Upgrading your Server This page is intentionally left blank ...
Page 305: ...Chapter 8 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Page 318: ...B 4 IRQ and I O Port Address This page is intentionally left blank ...
Page 326: ...C 8 Installing Windows 2000 This page is intentionally left blank ...
Page 340: ...10 Glossary This page is intentionally left blank ...
Page 345: ...xx ...
Page 346: ... ...